About the project:
C6, C7 and C8 Lógika type warehouses, from the Lógika Via 40 warehouses project.
Design scope
Execution time: 11 months
- Architectural
- Structural
- MEP (Networks)
- BIM modeling

Relevant information Terrace III Via 40
Design scope
Execution time: 11 months
- Architectural
- Structural
- MEP (Networks)
- BIM modeling
Productivity
Jobs created
Applied innovation
Sustainability
Recognitions
See more projects


EAFIT University Library
Indicator:
6.047 m2
Client:
EAFIT University
Economic sector:
Education


library Virgilio Barco
Indicator:
16.092 m2
Client:
Biblored
Economic sector:
Education


