Construction of 5 km of dual carriageway and complementary works including 2 tunnels with lengths of 1.857 and 1.880 meters, 2 bridges with lengths of 100 meters each, the San Miguel intersection, which connects sections 2a and 2b (currently in operation) with section 1 and the Guaduas bypass, the section 1 toll station and the Guaduas bypass toll station.

Relevant information Ruta del Sol Sector I (sections II and III)
Design scope
Productivity
Jobs created
Applied innovation
Sustainability
Recognitions