Miraflores Bridge

Client

ACP - Panama Canal Authority

Project stage

Infrastructure

Economic sector

Transport

Indicator

160m length

Project Type

Puentes

About the project:

Construction of a bridge using a system of prefabricated, transported and lifted post-tensioned beams, with a length of 160 m and a width of 6.0 m, which took 18 months to build.

Relevant information  Miraflores Bridge

Design scope

Productivity

Jobs created

Applied innovation

Sustainability

Awards

Gallery  Miraflores Bridge

See more projects

UPB Indoor Coliseum

Indicator:

17.362 m2

Client:

Universidad Pontificia Bolivariana

Economic sector:

Education

EAFIT University Library

Indicator:

6.047 m2

Client:

EAFIT University

Economic sector:

Education

CES University Library

Indicator:

Client:

Universidad CES

Economic sector:

Education

library Virgilio Barco

Indicator:

16.092 m2

Client:

Biblored

Economic sector:

Education

GHL Style Hotel

Indicator:

8.732 m2

Client:

Pactia SAS

Economic sector:

Hotelier

Hotel Estelar Cartagena de Indias

Indicator:

48.095 m2

Client:

Hotel Estelar SA

Economic sector:

Hotelier