About the project:
Construction of a bridge using a system of prefabricated, transported and lifted post-tensioned beams, with a length of 160 m and a width of 6.0 m, which took 18 months to build.
Relevant information Miraflores Bridge
Design scope
Productivity
Jobs created
Applied innovation
Sustainability
Awards
See more projects
EAFIT University Library
Indicator:
6.047 m2
Client:
EAFIT University
Economic sector:
Education
library Virgilio Barco
Indicator:
16.092 m2
Client:
Biblored
Economic sector:
Education
