About the project:
Construction of the extension of the NQS trunk line of the integrated TransMilenio system, in its phases II and III, where the BIM 360 methodology was implemented. In addition, the installation of networks, formation of the pavement structure and placement of asphalt mix, and the construction of phase 1 of the vehicular bridge and progress on the structure of the buildings.
Design scope
Relevant information Patio Portal El Vinculo
Design scope
Productivity
Jobs created
Applied innovation
Sustainability
Awards
See more projects
EAFIT University Library
Indicator:
6.047 m2
Client:
EAFIT University
Economic sector:
Education
library Virgilio Barco
Indicator:
16.092 m2
Client:
Biblored
Economic sector:
Education
