About the project:
Construction of the extension of the NQS trunk line of the TransMilenio integrated system, in its phases II and III, where the BIM 360 methodology was implemented. In addition, the installation of networks, shaping of the pavement structure and placement of asphalt mix, and the construction of phase 1 of the vehicular bridge and progress in the structure of the buildings.
Design scope

Relevant information Patio Portal El Vinculo
Design scope
Productivity
Jobs created
Applied innovation
Sustainability
Recognitions
See more projects


EAFIT University Library
Indicator:
6.047 m2
Client:
EAFIT University
Economic sector:
Education


library Virgilio Barco
Indicator:
16.092 m2
Client:
Biblored
Economic sector:
Education


