Patio Portal El Vinculo

Client

Regional railway company

Project stage

Designer

Economic sector

Public - Governmental

Indicator

108.026 m2

Project Type

Tracks and viaducts

About the project:

Construction of the extension of the NQS trunk line of the integrated TransMilenio system, in its phases II and III, where the BIM 360 methodology was implemented. In addition, the installation of networks, formation of the pavement structure and placement of asphalt mix, and the construction of phase 1 of the vehicular bridge and progress on the structure of the buildings.

Design scope

Relevant information  Patio Portal El Vinculo

Design scope

Productivity

Jobs created

Applied innovation

Sustainability

Awards

See more projects

UPB Indoor Coliseum

Indicator:

17.362 m2

Client:

Universidad Pontificia Bolivariana

Economic sector:

Education

EAFIT University Library

Indicator:

6.047 m2

Client:

EAFIT University

Economic sector:

Education

CES University Library

Indicator:

Client:

Universidad CES

Economic sector:

Education

library Virgilio Barco

Indicator:

16.092 m2

Client:

Biblored

Economic sector:

Education

GHL Style Hotel

Indicator:

8.732 m2

Client:

Pactia SAS

Economic sector:

Hotelier

Hotel Estelar Cartagena de Indias

Indicator:

48.095 m2

Client:

Hotel Estelar SA

Economic sector:

Hotelier