About the project:
The project consisted of the development of maritime works under an EPC (engineering, procurement and construction) contract, located in the Pacific Ocean. This work consisted of the design, supply and construction of a hydrocarbon transfer pier suitable for tankers of up to 70.000 DWT (Panamax type) and barges simultaneously

Relevant information Melones Oil Terminal
Design scope
Productivity
Jobs created
Applied innovation
Sustainability
Recognitions
See more projects


EAFIT University Library
Indicator:
6.047 m2
Client:
EAFIT University
Economic sector:
Education


library Virgilio Barco
Indicator:
16.092 m2
Client:
Biblored
Economic sector:
Education


