About the project:
This project was the first of its kind in Colombia and consisted of the tunnel construction of a wastewater interceptor in soft soils. The tunnel was 9.4 kilometers long, with an outer diameter of 4.52 meters and an inner diameter of 3.75 meters, constructed using a TBM (Tunnel Boring Machine) and prefabricated segments 25 cm thick. It also included 17 shafts with internal diameters of up to 18 meters and depths of over 20 meters for the construction and subsequent operation of the interceptor, as well as additional structures, also for its construction and operation. Built using TBM technology, a type of tunnel boring machine, it allowed for execution with minimal impact on traffic and the environment.