Interceptor Fucha Tunjuelo

Client

Bogotá Water and Sewerage Company

Project stage

Infrastructure

Economic sector

Public - Governmental

Indicator

9.4 km of soft ground tunnel

Project Type

Roads and tunnels

About the project:

This project was the first of its kind in Colombia and consisted of the tunnel construction of a wastewater interceptor in soft soils. The tunnel was 9.4 kilometers long, with an outer diameter of 4.52 meters and an inner diameter of 3.75 meters, constructed using a TBM (Tunnel Boring Machine) and prefabricated segments 25 cm thick. It also included 17 shafts with internal diameters of up to 18 meters and depths of over 20 meters for the construction and subsequent operation of the interceptor, as well as additional structures, also for its construction and operation. Built using TBM technology, a type of tunnel boring machine, it allowed for execution with minimal impact on traffic and the environment.

Relevant information  Interceptor Fucha Tunjuelo

Design scope

Productivity

Jobs created

Applied innovation

Sustainability

Recognitions

See more projects

UPB Indoor Coliseum

Indicator:

17.362 m2

Client:

Universidad Pontificia Bolivariana

Economic sector:

Education

EAFIT University Library

Indicator:

6.047 m2

Client:

EAFIT University

Economic sector:

Education

CES University Library

Indicator:

Client:

Universidad CES

Economic sector:

Education

library Virgilio Barco

Indicator:

16.092 m2

Client:

Biblored

Economic sector:

Education

GHL Style Hotel

Indicator:

8.732 m2

Client:

Pactia SAS

Economic sector:

Hotelier

Hotel Estelar Cartagena de Indias

Indicator:

48.095 m2

Client:

Hotel Estelar SA

Economic sector:

Hotelier