About the project:
Administrative office building of the Molino No. 4 building in Yumbo, owned by Smurfit Kappa Colombia (SKC).
Design scope
Execution time: 4 months
- Architectural
- Structural
- MEP (Networks)
- BIM modeling

Relevant information Mill Building 4
Design scope
Execution time: 4 months
- Architectural
- Structural
- MEP (Networks)
- BIM modeling
Productivity
Jobs created
Applied innovation
Sustainability
Recognitions
See more projects


EAFIT University Library
Indicator:
6.047 m2
Client:
EAFIT University
Economic sector:
Education


library Virgilio Barco
Indicator:
16.092 m2
Client:
Biblored
Economic sector:
Education


