About the project:
Building consisting of 5 docks, a warehouse for rack installation, and a battery room for forklifts.
Design scope
Execution time: 8 months
- Architectural
- Structural
- MPE (Networks)
- BIM modeling
Relevant information Fritolay Distribution Center
Design scope
Execution time: 8 months
- Architectural
- Structural
- MPE (Networks)
- BIM modeling
Productivity
Jobs created
Applied innovation
Sustainability
Awards
See more projects
EAFIT University Library
Indicator:
6.047 m2
Client:
EAFIT University
Economic sector:
Education
library Virgilio Barco
Indicator:
16.092 m2
Client:
Biblored
Economic sector:
Education
