About the project:
Stage 1 consists of the first two towers, each with 2 levels and a total of 26 apartments. Common areas include two swimming pools, a multi-purpose court, a steam room, a jacuzzi, a gym, a multi-purpose court, a BBQ area, and a children's playground.
Design scope
Execution time: 27 months
- Structural
- MEP (networks)
- BIM modeling
Relevant information Zanetti
Design scope
Execution time: 27 months
- Structural
- MEP (networks)
- BIM modeling
Productivity
Jobs created
Applied innovation
Sustainability
Recognitions
See more projects
EAFIT University Library
Indicator:
6.047 m2
Client:
EAFIT University
Economic sector:
Education
library Virgilio Barco
Indicator:
16.092 m2
Client:
Biblored
Economic sector:
Education
