About the project:
Exclusive corridor for the Transmilenio (BRT) system, mixed-traffic lanes, a bike lane, a BRT vehicle bridge on the Suba Trunk Road, a BRT vehicle underpass that will connect to the Suba Trunk Road and two new Transmilenio stations, as well as ticket offices and an adjacent bicycle station.
Design scope
Execution time: 8 months
- Architectural
- Structural
- MEP (networks)
- BIM modeling
- Topography
- Geometric track
- Geotechnics
- Signaling
Relevant information Transmilenio Av 68 – Group 8
Design scope
Execution time: 8 months
- Architectural
- Structural
- MEP (networks)
- BIM modeling
- Topography
- Geometric track
- Geotechnics
- Signaling
Productivity
Jobs created
Applied innovation
Sustainability
Awards
See more projects
EAFIT University Library
Indicator:
6.047 m2
Client:
EAFIT University
Economic sector:
Education
library Virgilio Barco
Indicator:
16.092 m2
Client:
Biblored
Economic sector:
Education