Transmilenio Av 68 – Group 8

Client

Bogotá Urban Development Institute

Project stage

Designer

Economic sector

Transport

Indicator

113.120 m2

Project Type

Roads and viaducts

About the project:

Exclusive corridor for the Transmilenio (BRT) system, mixed-traffic lanes, a bike lane, a BRT vehicle bridge on the Suba Trunk Road, a BRT vehicle underpass that will connect to the Suba Trunk Road and two new Transmilenio stations, as well as ticket offices and an adjacent bicycle station.

Design scope

Execution time: 8 months

  • Architectural
  • Structural
  • MEP (networks)
  • BIM modeling
  • Topography
  • Geometric track
  • Geotechnics
  • Signaling

Relevant information  Transmilenio Av 68 – Group 8

Design scope

Execution time: 8 months

  • Architectural
  • Structural
  • MEP (networks)
  • BIM modeling
  • Topography
  • Geometric track
  • Geotechnics
  • Signaling

Productivity

Jobs created

Applied innovation

Sustainability

Awards

Gallery  Transmilenio Av 68 – Group 8

See more projects

UPB Indoor Coliseum

Indicator:

17.362 m2

Client:

Universidad Pontificia Bolivariana

Economic sector:

Education

EAFIT University Library

Indicator:

6.047 m2

Client:

EAFIT University

Economic sector:

Education

CES University Library

Indicator:

Client:

Universidad CES

Economic sector:

Education

library Virgilio Barco

Indicator:

16.092 m2

Client:

Biblored

Economic sector:

Education

GHL Style Hotel

Indicator:

8.732 m2

Client:

Pactia SAS

Economic sector:

Hotelier

Hotel Estelar Cartagena de Indias

Indicator:

48.095 m2

Client:

Hotel Estelar SA

Economic sector:

Hotelier