Puerto Azul T8

Client

Conconcreto Housing

Project stage

Design

Economic sector

Housing

Indicator

6.868 m2

Project Type

Housing

About the project:

Puerto Azul Club House has completed phase 1 and is in the process of constructing phase 2. The scope of the IDD is the structural and network design, only the telecommunications and electrical networks up to the construction documents phase, including the accompaniment of tower 8, which has 8 floors with 12 apartments per floor for a total of 192 apartments.

The estimated area for the apartments is 58m2The proposed structural system will consist of cast concrete walls. Parking and common areas are not included in this scope. The constructed area is 6.600 mXNUMX.2.

Design scope

Execution time: 9 months

  • Structural
  • MEP (Networks)
  • BIM modeling

Relevant information  Puerto Azul T8

Design scope

Execution time: 9 months

  • Structural
  • MEP (Networks)
  • BIM modeling

Productivity

Jobs created

Applied innovation

Sustainability

Recognitions

Gallery  Puerto Azul T8

See more projects

UPB Indoor Coliseum

Indicator:

17.362 m2

Client:

Universidad Pontificia Bolivariana

Economic sector:

Education

EAFIT University Library

Indicator:

6.047 m2

Client:

EAFIT University

Economic sector:

Education

CES University Library

Indicator:

Client:

Universidad CES

Economic sector:

Education

library Virgilio Barco

Indicator:

16.092 m2

Client:

Biblored

Economic sector:

Education

GHL Style Hotel

Indicator:

8.732 m2

Client:

Pactia SAS

Economic sector:

Hotelier

Hotel Estelar Cartagena de Indias

Indicator:

48.095 m2

Client:

Hotel Estelar SA

Economic sector:

Hotelier