Puerto Azul T5-T7

Client

Conconcreto Housing

Project stage

Designer

Economic sector

Housing

Indicator

14.962 m2

Project Type

Housing

About the project:

Puerto Azul Club House currently has stage 1 built and is in the process of building stage 2 and marketing tower 8, which corresponds to stage 3. The IDD's scope is the Architectural, Structural and Electromechanical network design up to the schematic phase, of towers 5 and 7, which are identical, with 8 floors each and 12 apartments per floor for a total of 192 apartments.

The estimated area for the apartments is 32m2The proposed structural system will consist of cast concrete walls. Parking and common areas are not included in this scope. The constructed area is 7.481,52 m.2.

Design scope

Execution time: 7 months

  • Structural
  • MEP (Networks)
  • BIM modeling

Relevant information  Puerto Azul T5-T7

Design scope

Execution time: 7 months

  • Structural
  • MEP (Networks)
  • BIM modeling

Productivity

Jobs created

Applied innovation

Sustainability

Awards

Gallery  Puerto Azul T5-T7

See more projects

UPB Indoor Coliseum

Indicator:

17.362 m2

Client:

Universidad Pontificia Bolivariana

Economic sector:

Education

EAFIT University Library

Indicator:

6.047 m2

Client:

EAFIT University

Economic sector:

Education

CES University Library

Indicator:

Client:

Universidad CES

Economic sector:

Education

library Virgilio Barco

Indicator:

16.092 m2

Client:

Biblored

Economic sector:

Education

GHL Style Hotel

Indicator:

8.732 m2

Client:

Pactia SAS

Economic sector:

Hotelier

Hotel Estelar Cartagena de Indias

Indicator:

48.095 m2

Client:

Hotel Estelar SA

Economic sector:

Hotelier