About the project:
Architectural, Structural and Network Design (electrical, lighting, shielding, grounding, plumbing, fire extinguishing, gas and communications) up to the construction documents phase of the project located on lot 3 which is part of the Ciudadela de la Primavera real estate development in the city of Neiva, Department of Huila, Colombia, which has an area of 8,450m2 with 3 identical towers of 12 floors for housing, each with 8 apartments per floor for a total of 288 apartments with an area of approximately 50m2 per apartment, whose structural system is made up of poured concrete walls, all parking spaces are exterior. The project has a total built area of 18,542m2 which has common areas and services.
This project was planned in three construction stages, one for each tower and its communal services and parking areas.
Design scope
Execution time: 14 months
- Architectural
- Structural
- MEP (Networks)
- BIM modeling
Relevant information Green Spring
Design scope
Execution time: 14 months
- Architectural
- Structural
- MEP (Networks)
- BIM modeling
Productivity
Jobs created
Applied innovation
Sustainability
Awards