Green Spring

Client

Conconcreto Housing

Project stage

Designer

Economic sector

Housing

Indicator

18.300 m2

Project Type

Housing

About the project:

Architectural, Structural and Network Design (electrical, lighting, shielding, grounding, plumbing, fire extinguishing, gas and communications) up to the construction documents phase of the project located on lot 3 which is part of the Ciudadela de la Primavera real estate development in the city of Neiva, Department of Huila, Colombia, which has an area of ​​8,450m2 with 3 identical towers of 12 floors for housing, each with 8 apartments per floor for a total of 288 apartments with an area of ​​approximately 50m2 per apartment, whose structural system is made up of poured concrete walls, all parking spaces are exterior. The project has a total built area of ​​18,542m2 which has common areas and services.

This project was planned in three construction stages, one for each tower and its communal services and parking areas.

Design scope

Execution time: 14 months

  • Architectural
  • Structural
  • MEP (Networks)
  • BIM modeling

Relevant information  Green Spring

Design scope

Execution time: 14 months

  • Architectural
  • Structural
  • MEP (Networks)
  • BIM modeling

Productivity

Jobs created

Applied innovation

Sustainability

Awards

Gallery  Green Spring

Location:

See more projects

UPB Indoor Coliseum

Indicator:

17.362 m2

Client:

Universidad Pontificia Bolivariana

Economic sector:

Education

EAFIT University Library

Indicator:

6.047 m2

Client:

EAFIT University

Economic sector:

Education

CES University Library

Indicator:

Client:

Universidad CES

Economic sector:

Education

library Virgilio Barco

Indicator:

16.092 m2

Client:

Biblored

Economic sector:

Education

GHL Style Hotel

Indicator:

8.732 m2

Client:

Pactia SAS

Economic sector:

Hotelier

Hotel Estelar Cartagena de Indias

Indicator:

48.095 m2

Client:

Hotel Estelar SA

Economic sector:

Hotelier