Nutresa Multiambientes CTG

Client

Nourishes

Project stage

Design

Economic sector

Logistic

Indicator

6.416 m2

Project Type

Center of distribution

About the project:

Storage warehouse, docks, offices, service buildings, gatehouse, technical rooms including pump rooms and tanks, as well as tracks, maneuvering yards, platforms and ramps, green areas, and parking lots.

Design scope

Execution time: 15 months

  • Architecture
  • Structural
  • MEP (networks)
  • BIM modeling

Relevant information  Nutresa Multiambientes CTG

Design scope

Execution time: 15 months

  • Architecture
  • Structural
  • MEP (networks)
  • BIM modeling

Productivity

Jobs created

Applied innovation

Sustainability

Recognitions

Gallery  Nutresa Multiambientes CTG

Location:

See more projects

UPB Indoor Coliseum

Indicator:

17.362 m2

Client:

Universidad Pontificia Bolivariana

Economic sector:

Education

EAFIT University Library

Indicator:

6.047 m2

Client:

EAFIT University

Economic sector:

Education

CES University Library

Indicator:

Client:

Universidad CES

Economic sector:

Education

library Virgilio Barco

Indicator:

16.092 m2

Client:

Biblored

Economic sector:

Education

GHL Style Hotel

Indicator:

8.732 m2

Client:

Pactia SAS

Economic sector:

Hotelier

Hotel Estelar Cartagena de Indias

Indicator:

48.095 m2

Client:

Hotel Estelar SA

Economic sector:

Hotelier