About the project:
Expansion of the existing pier, 267 meters of reinforced concrete structure, consisting of 0,8-meter diameter piles for both rail beams and the platform. Load capacity of 5 t/m2.

Relevant information Contecar Dock
Design scope
Productivity
Jobs created
Applied innovation
Sustainability
Awards
See more projects


EAFIT University Library
Indicator:
6.047 m2
Client:
EAFIT University
Economic sector:
Continuing


library Virgilio Barco
Indicator:
16.092 m2
Client:
Biblored
Economic sector:
Continuing

