About the project:
Project developed on 6 architectural floors, distributed in 77 offices, its parking development is located in a basement with an area of 19.604 m2, plus a tower and a basement with a total area of 8.689 m2.
Design scope
Execution time: 14 months
- Architectural
- Structural
- MEP (Networks)
- Bioclimatic
- BIM modeling

Relevant information IBM Bureau 25 T3 and Parking