About the project:
The Hotel Movich Las Lomas project includes two new buildings attached to the existing structure. One of these two new buildings consists of an expansion of hotel capacity through a 111-room standard building, housed on five levels, as well as technical and service rooms for operations. The top level includes a VIP lounge for special guests. The second building consists of an expansion of the existing main auditorium with a two-level annex building, an expansion of the lobby, service areas, and public restrooms.
Design scope
Execution time: 17 months
- Architecture
- Structural
- MEP (networks)
- Bioclimatic
- BIM modeling
Relevant information Hotel Movich Las Lomas
Design scope
Execution time: 17 months
- Architecture
- Structural
- MEP (networks)
- Bioclimatic
- BIM modeling
Productivity
Jobs created
Applied innovation
Sustainability
Recognitions
See more projects
EAFIT University Library
Indicator:
6.047 m2
Client:
EAFIT University
Economic sector:
Education
library Virgilio Barco
Indicator:
16.092 m2
Client:
Biblored
Economic sector:
Education
