About the project:
Construction of a hydroelectric plant with an installed capacity of 660 MW for a generation of 3.605 gigawatts; the dam has a height of 151 meters.
Relevant information Porce III Hydroelectric Plant
Design scope
Productivity
Jobs created
Applied innovation
Sustainability
Recognitions
See more projects
EAFIT University Library
Indicator:
6.047 m2
Client:
EAFIT University
Economic sector:
Education
library Virgilio Barco
Indicator:
16.092 m2
Client:
Biblored
Economic sector:
Education
