About the project:
The project for Copa Airlines consisted of the simultaneous construction on 3 work fronts of the following areas: * Expansion of the North Wing: Construction area: 748.63 m2. * Brake Shop: Construction area: 738.83 m2 * Industrial water collection wheel: 182.79 m of pipes, channels and rainwater collection boxes
Relevant information Copa Airlines Hangar
Design scope
Productivity
Jobs created
Applied innovation
Sustainability
Recognitions
See more projects
EAFIT University Library
Indicator:
6.047 m2
Client:
EAFIT University
Economic sector:
Education
library Virgilio Barco
Indicator:
16.092 m2
Client:
Biblored
Economic sector:
Education
