About the project:
SPRC Office, Cafeteria and Occupational Health Building of 2.678 m2
Design scope
Execution time: 10 months
- Architecture
- Structural
- MEP (networks)
- Bioclimatic
- BIM modeling

Relevant information SPRC Building
Design scope
Execution time: 10 months
- Architecture
- Structural
- MEP (networks)
- Bioclimatic
- BIM modeling
Productivity
Jobs created
Applied innovation
Sustainability
Awards
See more projects


EAFIT University Library
Indicator:
6.047 m2
Client:
EAFIT University
Economic sector:
Continuing


library Virgilio Barco
Indicator:
16.092 m2
Client:
Biblored
Economic sector:
Continuing

