About the project:
Building called "DataCenter." It has an area of 1000 m2, of which 250 m2 are the data center and 750 m2 are the offices.
Design scope
Execution time: 10 months
- Architecture
- Structural
- MEP (networks)
- BIM modeling
Relevant information Data Center Building
Design scope
Execution time: 10 months
- Architecture
- Structural
- MEP (networks)
- BIM modeling