Ecocements

Client

Corona Organization

Project stage

Design

Economic sector

Industrial

Indicator

8.407 m2

Project Type

Offices

About the project:

The Ecocementos cement plant and its administrative building, owned by the Corona Organization, are located in the municipality of Sonsón, in the department of Antioquia.

Design scope

Execution time: 24 months

  • Architecture
  • Structures
  • MEP (networks)
  • BIM modeling

Relevant information  Ecocements

Design scope

Execution time: 24 months

  • Architecture
  • Structures
  • MEP (networks)
  • BIM modeling

Productivity

Jobs created

Applied innovation

Sustainability

Recognitions

Gallery  Ecocements

See more projects

UPB Indoor Coliseum

Indicator:

17.362 m2

Client:

Universidad Pontificia Bolivariana

Economic sector:

Education

EAFIT University Library

Indicator:

6.047 m2

Client:

EAFIT University

Economic sector:

Education

CES University Library

Indicator:

Client:

Universidad CES

Economic sector:

Education

library Virgilio Barco

Indicator:

16.092 m2

Client:

Biblored

Economic sector:

Education

GHL Style Hotel

Indicator:

8.732 m2

Client:

Pactia SAS

Economic sector:

Hotelier

Hotel Estelar Cartagena de Indias

Indicator:

48.095 m2

Client:

Hotel Estelar SA

Economic sector:

Hotelier