About the project:
Logistics project comprising a storage warehouse, docks, offices, service buildings, and a concierge.
Design scope
Execution time: 8 months
- Architecture
- Structural
- MEP (Networks)
- BIM modeling
- Topography
- Soil study
- Environmental studies
Relevant information Nutresa NX1 Distribution Center, Palermo
Design scope
Execution time: 8 months
- Architecture
- Structural
- MEP (Networks)
- BIM modeling
- Topography
- Soil study
- Environmental studies
Productivity
Jobs created
Applied innovation
Sustainability
Awards
See more projects
EAFIT University Library
Indicator:
6.047 m2
Client:
EAFIT University
Economic sector:
Education
library Virgilio Barco
Indicator:
16.092 m2
Client:
Biblored
Economic sector:
Education
