Ituango Hydroelectric Power Plant

Client

Public enterprises of Medellin

Project stage

Infrastructure

Economic sector

Public - Governmental

Indicator

2.400 MW

Project Type

Hydroelectric

About the project:

The project includes a 225-meter-high dam with a capacity of 20 million cubic meters, an underground power plant with an installed capacity of 3 MW and an average annual energy output of 2.400 GWh.

Relevant information  Ituango Hydroelectric Power Plant

Design scope

Productivity

Jobs created

Applied innovation

Sustainability

Recognitions

Gallery  Ituango Hydroelectric Power Plant

Location:

See more projects

UPB Indoor Coliseum

Indicator:

17.362 m2

Client:

Universidad Pontificia Bolivariana

Economic sector:

Education

EAFIT University Library

Indicator:

6.047 m2

Client:

EAFIT University

Economic sector:

Education

CES University Library

Indicator:

Client:

Universidad CES

Economic sector:

Education

library Virgilio Barco

Indicator:

16.092 m2

Client:

Biblored

Economic sector:

Education

GHL Style Hotel

Indicator:

8.732 m2

Client:

Pactia SAS

Economic sector:

Hotelier

Hotel Estelar Cartagena de Indias

Indicator:

48.095 m2

Client:

Hotel Estelar SA

Economic sector:

Hotelier