About the project:
Design and construction of the second runway at El Dorado Airport and complementary works, including the supply, installation, and testing of electrical equipment and navigation aids. The second runway at the country's largest airport is 3.800 m long and 60 m wide.
Design scope
Relevant information 2nd runway El Dorado Airport
Design scope
Productivity
Jobs created
Applied innovation
Sustainability
Recognitions
See more projects
EAFIT University Library
Indicator:
6.047 m2
Client:
EAFIT University
Economic sector:
Education
library Virgilio Barco
Indicator:
16.092 m2
Client:
Biblored
Economic sector:
Education
